Fortera tracks progress from the apartment outward and the building inward, enforces the real sequence of work, and scores occupancy-certificate readiness live, no separate Excel, no last-minute scramble.

Construction & Operations, module view

Screenshot placeholder

What's inside

Modules in this pillar

Project hierarchy

Entity → project → tower / block → floor → unit, so every cost, PO and progress tick anchors to exactly one scope.

Construction progress tracking

Apartment-level (40–45 items) and building-level (15–20 items) tracked together; floors roll up automatically.

Priority & sequencing engine

Enforces dependencies, raft → footing → column → slab; locks before cabling, and surfaces the next eligible task.

Quality assurance

No vendor payment without a passing quality report on file, with an audited owner override.

NOC & authority approvals

Every approval, applied, in process, received, expiring, in one register with 90/30/7-day alerts.

Occupancy & handover

A ~67-point OC checklist that scores itself, plus snag lists and a documented handover.

OC readiness, live

A single score, “84% OC-ready”, with the open items called out, accurate to the day.

Field-first input

A site supervisor walks a unit and taps through 40+ items on a tablet, offline if needed.